Barnet roads and travel news

Barnet roads and travel news, newest first: closures, roadworks, rail changes, buses and parking, from the authorities' own notices.

All

Travel update Northern line Northern line: severe delays after Edgware branch suspension TfL no longer lists the Camden Town to Edgware suspension. The Northern line still has severe delays, and London Buses accept Tube tickets, TfL says. · 1 min read Transport No Elizabeth Line at Tottenham Court Road on 28 and 29 November No Elizabeth line trains from Paddington to Abbey Wood, Shenfield or Heathrow on 28 and 29 November. Paddington shuts too, so use the Piccadilly for Heathrow. · 3 min read Transport Oxford Street Traffic Free: Footfall Up 16% in Week One Footfall rose 16% and spending 28% in Oxford Street's first traffic-free week, City Hall says. Buses ran well, TfL says, including the four from Barnet. · 6 min read Transport Night Tube Turns 10 With 12 Barnet Stations on the Route Twelve Barnet stations are on the Night Tube, now 10 years old, and High Barnet is 33 minutes from Leicester Square at 2.41am. Checked November 2026. · 8 min read Transport Oxford Street Traffic Free: What Changes for Barnet Buses The 13, 113, 139 and 189 from Barnet now use stops off Oxford Street's closed stretch, and the Northern line still gets you there. Checked November 2026. · 9 min read Transport Only 3.7% of Barnet Residents Live Near a Main Cycle Route Only 3.7% of Barnet residents live within 400 metres of London's strategic cycle network, against 45.9% in Enfield. Figures checked November 2026. · 3 min read London Assembly Assembly Backs Jewish Londoners 19 to 3 in Eight Motions The London Assembly voted 19 to 3 to stand with Jewish Londoners and 20 to 1 for Grenfell justice on 5 November. Here is what all eight motions ask for. · 6 min read Roads Barnet Road Repairs 2027: £18.8m Plan, £103m Backlog Barnet plans £18.75m of road and pavement repairs in 2027-28, with more for footways. Fixing every worn road would cost £103m. Councillors see it on 9 November. · 5 min read Transport TfL Fare Dodger Crackdown: 24 Arrests in First Month Plain-clothes police and TfL inspectors stopped 467 people and made 24 arrests in Operation Vector's first month. What it means at Barnet's Tube stations. · 4 min read Transport West London Orbital Named in Budget as a New Levy Target The Budget names the Hendon-to-Hounslow West London Orbital as a line a new London business rates levy could help pay for. TfL drop-ins: Brent Cross West 3 Nov, Hendon 5 Nov. · 3 min read London Assembly Thames Bridge Hearing 3 Nov: Two Shut, Three Weight-Limited Hammersmith and Albert bridges are shut to traffic and three more carry 18-tonne limits. The Assembly questions bridge owners at City Hall on Tuesday at 10am. · 3 min read Roads Exeter Road No Right Turn: 804 Sign Petition to End Trial 804 people signed the petition to end Barnet's peak-hour no right turn into Exeter Road, N14, which closes today. That is enough to go to a council committee. How to object by January. · 4 min read Edgware Edgware Roadworks: Road Closures and Traffic Orders Near Edgware Edgware roadworks: no temporary traffic orders in force within 3 km of Edgware right now. Checked every morning from the council's notices. Finchley Finchley Roadworks: Road Closures and Traffic Orders Near Finchley Finchley roadworks: Temple Fortune Lane (from 16 Nov) and every other traffic order within 3 km, checked each morning with the council's notice linked. Roads Brent Cross Flyover: One Lane Each Way for Up to Two Years The westbound A406 shuts overnight on 12 and 13 November and Hendon Way on 19 and 20 November. Work then pauses for Christmas, with seven more closures in January. · 8 min read Transport West London Orbital: Hendon to Hounslow Line Open to Comment TfL's West London Orbital would run Overground trains from Hendon via Brent Cross West to Hounslow from around 2035. Comments close 18 November; drop-in dates. · 4 min read Barnet Barnet Christmas Travel: Tube, Thameslink and Last Trains No Thameslink, Tube or buses on Christmas Day 2026. Last year Thameslink also ran nothing on Boxing Day and was done by 9pm on Christmas Eve. 2026 plans due Dec. · 5 min read Transport Barnet EV Charging Bays: Five to Go, Object by 15 Oct Five on-street charging bays would go and one would move, three on Grahame Park Way. Objections close 15 October; Barnet's charger total is already falling. · 5 min read Burnt Oak Burnt Oak station works start Monday and run 474 days Barnfield Road's one-way system is suspended from 8am on Monday 31 August for 474 days, for the step-free access build at Burnt Oak station. The council's dates contradict each other. · 5 min read Parking Barnet parking changes: 14 junctions, object by 27 August Barnet wants double yellow lines at 14 junctions, from Denman Drive NW11 to Raydean Road EN5. Objections close on Thursday 27 August, quoting SCR724. · 6 min read Transport Barnet bus strikes: September and October dates suspended TfL says the Arriva bus strikes set for September and October were suspended, so routes 34, 102, 221, 307 and SL1 run as normal. No new dates are listed. · 6 min read